Constructive Collaboration
As a technical conference following the theme of Constructive Collaboration, this conference will explore in detail four key aspects of the industry – Government Reform and Regulatory Changes, Delivering for Society, Industry Reform and Changing Industry Business Models, and Technology – Riding the Crest of the Wave.
Bringing industry experts together to delve deeper into the challenges we face and the changes necessary to overcome them, and opportunities for the future to further develop, in a positive way, the safety of our industry.
An opportunity to ask questions directly to our expert speakers will conclude each session.
Alongside our speaker programme, make sure you take the time to visit our trade exhibition, and listen to our insightful exhibitor sessions. This event provides you with an opportunity for positive engagements with construction professionals, and a chance to expand your knowledge.
Testimonial
“CABE's Built Environment England Conference in June 2023 was a dynamic gathering that fostered a vibrant community spirit among industry peers. Informative sessions ignited fresh perspectives, and the collaborative atmosphere encouraged meaningful exchanges. A truly enriching experience that left me inspired and connected. Highly recommended for professionals seeking insight and camaraderie.”
Joshua Katihrob BSc(Hons)
MCABE
Location
Address
City CampusHoward Street
Sheffield
S1 1WB
Website
https://www.shu.ac.uk/visit-us/how-to-find-usCPD
8 hours CPD* Book 3 places and save 10%
Please contact the Built Environment Team on [email protected] to retrieve the discount code for this offer.
* Book 5 places for the price of 4
Maximum of 5 registrations per booking, automatic discount on 5th place.
These terms and conditions apply in conjunction with the Events Terms and Conditions
1.1. If you wish to purchase 3 tickets as part of one order, you are eligible to receive a 10% discount to the total price. Please email your request for a discount code to [email protected] who will provide you with the discount code to be applied to your basket.
1.2. If you wish to purchase 5 tickets as part of one order, the cost of the cheapest ticket will automatically be deducted from the total order price.
2. These discounts offers are only valid for the following Events:
- CABE Built Environment England
- CABE Built Environment Wales
- CABE Built Environment Ireland
3.1. You may only benefit from one of the discount offers per order. The discount offers outlined in clause 1.1 and 1.2 cannot be used in conjunction with each other or any other discount offer, unless otherwise stated.
3.2. Except for when you are attempting to purchase 3 or 5 tickets within one order, if you
want to purchase any other number of tickets, you will not be eligible to benefit from any
discounts offer outlined in these terms and conditions and will be required to pay the full
price.
3.2.1. For instance, if you want to purchase 6 tickets, you will not be eligible to benefit
from a 10% discount as outlined in clause 1.1 and you will not be eligible to benefit from the
free ticket provided by clause 1.2.
4.1 CABE reserves the right to remove or amend any or all of the discount offers at any time
without reason or justification. The removal or amendment of the discount offers will not
affect the tickets purchased prior to the removal of the discount offer.
4.1.1 Any tickets left in the basket at the time of removing the discount offers will no
longer benefit from a discount.
4.1.2 Any tickets left in the basket at the time of the discount offers being amended
will only be able to benefit from the amended discount offers and not the discount offers
existing prior to the amendment.
5. CABE will not be liable for any financial loss arising out of the removal or amendment of
any discount offers or any failure or inability of a customer to take advantage of the
discounts offers, howsoever caused.
6. In the event that a request for a refund is deemed valid as per our Events terms and
conditions, then if applicable, any financial benefit you have received as part of these
discounts offers may be deducted from the sum due to you. In any event, you will not receive
a financial sum above the amount that you purchased the tickets for.
7. CABE reserves the right to reject any bookings placed on the Events detailed in clause 2
to those that do not comply with these terms for discount offers. In such a case, you will be
provided with a refund.
8. CABE reserves the right to reject entry to the events detailed in clause 2 to any delegate
who fails to adhere to these terms and/or the Events terms and conditions.
Event Prices
* Book 3
places and
save 10%
* Book 5
places for
the price
of 4
* Book 3 places and save 10%
Please contact the Built Environment Team on [email protected] to retrieve the discount code for this offer.
* Book 5 places for the price of 4
Maximum of 5 registrations per booking, automatic discount on 5th place.
These terms and conditions apply in conjunction with the Events Terms and Conditions
1.1. If you wish to purchase 3 tickets as part of one order, you are eligible to receive a 10% discount to the total price. Please email your request for a discount code to [email protected] who will provide you with the discount code to be applied to your basket.
1.2. If you wish to purchase 5 tickets as part of one order, the cost of the cheapest ticket will automatically be deducted from the total order price.
2. These discounts offers are only valid for the following Events:
- CABE Built Environment England
- CABE Built Environment Wales
- CABE Built Environment Ireland
3.1. You may only benefit from one of the discount offers per order. The discount offers outlined in clause 1.1 and 1.2 cannot be used in conjunction with each other or any other discount offer, unless otherwise stated.
3.2. Except for when you are attempting to purchase 3 or 5 tickets within one order, if you
want to purchase any other number of tickets, you will not be eligible to benefit from any
discounts offer outlined in these terms and conditions and will be required to pay the full
price.
3.2.1. For instance, if you want to purchase 6 tickets, you will not be eligible to benefit
from a 10% discount as outlined in clause 1.1 and you will not be eligible to benefit from the
free ticket provided by clause 1.2.
4.1 CABE reserves the right to remove or amend any or all of the discount offers at any time
without reason or justification. The removal or amendment of the discount offers will not
affect the tickets purchased prior to the removal of the discount offer.
4.1.1 Any tickets left in the basket at the time of removing the discount offers will no
longer benefit from a discount.
4.1.2 Any tickets left in the basket at the time of the discount offers being amended
will only be able to benefit from the amended discount offers and not the discount offers
existing prior to the amendment.
5. CABE will not be liable for any financial loss arising out of the removal or amendment of
any discount offers or any failure or inability of a customer to take advantage of the
discounts offers, howsoever caused.
6. In the event that a request for a refund is deemed valid as per our Events terms and
conditions, then if applicable, any financial benefit you have received as part of these
discounts offers may be deducted from the sum due to you. In any event, you will not receive
a financial sum above the amount that you purchased the tickets for.
7. CABE reserves the right to reject any bookings placed on the Events detailed in clause 2
to those that do not comply with these terms for discount offers. In such a case, you will be
provided with a refund.
8. CABE reserves the right to reject entry to the events detailed in clause 2 to any delegate
who fails to adhere to these terms and/or the Events terms and conditions.
Programme
Registration and Exhibition
Welcome from CABE President
Richard Flynn
President
Chartered Association of Building Engineers (CABE)
SITMA – Competence Creates Confidence
Barry Cope
Group Managing Director
SITMA
Building Regulations, Compliance and Regulatory Changes – Government Reform
Richard Harral
Interim Chief Executive Officer
Chartered Association of Building Engineers (CABE)
Gary Cass
Chief Executive Officer
Broste Rivers (Hertfordshire Building Control, Build Insight, BCC Consult & BCC Adaptations)
Neil Hope-Collins
Operational Policy Lead, HRB Building Control Authority
Building Safety Regulator
Abigail Howie
Principal Building Engineer for the Technical Policy Team
HSE - Building Safety Regulator
Delta Membranes – Waterproofing Below Ground Structures
Richard Harral
Interim Chief Executive Officer
Chartered Association of Building Engineers (CABE)
Michael Vernon
Structural Waterproofing Consultant
Delta Membrane Systems Limited
Morning Break and Exhibition
Delivering for Society – Social, Economic and Environmental Impact of Failure
Zoe Cox
Vice President
Chartered Association of Building Engineers (CABE)
Thomas Roche
Secretary
Business Sprinkler Alliance
Chris O'Regan
Associate Director
Mason Navarro Pledge (MNP)
Lunch and Exhibition
Changing Construction Industry Business Models – Industry Reform
Paul Grinyer CEng FCABE CBuildE MIStructE
Vice President
Chartered Association of Building Engineers (CABE)
Iain Mcilwee
Chief Executive Officer
Finishes and Interiors Sector (FIS)
Darya Bahram
Research Associate
Centre of Construction Law, King's College London
Unilin Insulation – Part L regulations & accounting for embodied carbon
Richard Harral
Interim Chief Executive Officer
Chartered Association of Building Engineers (CABE)
Donna Seward
Specification Manager
Unilin Insulation
Afternoon Break and Exhibition
Technology – Riding the Crest of the Wave
David Churcher MBE
Director
Hitherwood Consulting
Closing Remarks
End of Day
Headline Sponsor
SITMA is a UKAS accredited certification scheme and is a not-for-profit organisation that provides individual Sound Testers with a recognised and valued method of demonstrating their professional competence in Sound Insulation Testing. It provides the construction industry with a standardised certified report that ensures continued compliance with the requirements of Local Governments, Building Regulations, and relevant Testing Standards.
Abigail Howie
Barry Cope
Chris O’Regan
Chris encourages an integrated design approach by engaging with other members of the design team for building projects by presenting outline concepts that are worked through with other disciplines. This reduces the common issues raised during design development and leads to a more cohesive building project. This also results in safer buildings to use.
Darya Bahram
She has held senior role at the Association of Consultant Architects as Secretary General, Head of Professional Appointments at Assael Architecture and is currently the committee member of the Construction Blockchain Consortium. Darya is a published author and speaker on a range of topics including ‘Procuring Net zero carbon construction’ , ‘Procurement strategies for incentivizing collaborative delivery to optimize whole-life outcomes’, ‘Blockchain and smart contracts’, ‘Disruptive technology and collaborative contracts’, ‘Modern methods of construction: contractual mechanisms supporting long term relationships’ and ‘Guidance on Collaborative Procurement for Design and Construction to Support Building Safety’.
David Churcher MBE
Donna Seward
Gary Cass
His academic accomplishments include becoming the inaugural LABC/CIOB scholar, a Master’s from the University of Cambridge and his ongoing PhD, all underpin his dedication to improving the built environment’s impact on end users.
Gary’s is also a board and MPSC committee member for CABE, embodying his commitment to excellence in the construction industry and our profession, focusing on regulatory impacts and safety.
Iain Mcilwee
In addition to his role at FIS, Iain sits on various Construction Leadership Council Working Groups, the Steering Board of the City of London Corporation’s Skills for a Sustainable Skyline Taskforce and is a Director of SKArating, the environmental assessment method, benchmark and standard for non-domestic fit-outs. Iain has been a Construction Fairness, Inclusivity and Respect Ambassador since 2021.
Michael Vernon
Neil Hope-Collins
Paul Grinyer CEng FCABE CBuildE MIStructE
Paul was elected as a Board Director of CABE commencing in June 2021 and has been elected as Vice President from June 2024. Paul has been a member of the Membership & Professional Standards Committee since its inception in 2019, becoming Vice-Chair in 2022 and taking the role of MPSC Chair in May 2024. Paul has also served as a Trustee of the CABE Benevolent Fund.
Richard Flynn
Richard is a recognised expert in the area of onsite wastewater treatment and provides a complete site suitability assessment, treatment system design, and certification of installation for onsite wastewater treatment systems throughout Ireland. Richard has been Chair of the CABE Membership and Professional Standards Committee (MPSC) since its inception in 2019 as well as member of the Southern Ireland Region committee of CABE.
Richard Harral
Thomas Roche
Zoe Cox
Contact Us
Phone: +44 (0)20 7880 6208
Email: [email protected]